Shifted 7KW Grid Tied Solar Plant at Sector 15, Sonipat by Team Loyal

Each project teaches something new to us. We learn different ways of doing the same thing with time and experience. This Solar plant was a special one. Our esteemed customer initially directed us to put up the Solar plant on the Iron Fabricated jaal at the level of his 2nd floor/roof. The Renewable Energy department during the initial site inspection allowed the installation on Iron jaal, as they were told that it is the customer’s wish to put the Solar plant southwards in order to avoid the visibility of Solar panels from his house’s front view(As in the front glasses have been put up for beautification purpose). We along with our associate partners M/s Shleyroyal Imagineering installed the Solar plant within 2 days on the Iron fabricated structure and called the Renewable Energy staff on customer’s behalf for post installation inspection. They rejected to give Project Completion Report on the grounds that Solar plant can not be installed in Iron Jaal and has to be shifted to concrete rooftop to get PCR. The customer was made aware of the same and he then asked us to shift the plant on his concrete roof with a minimum raised height of 4.5 feet. The installation will be complete in next two days and we believe the Customer will get clearance from the renewable energy department now. He is currently suffering from a loss of power generation of atleast 30 KWh or units of Electricity everyday.

The shifting process took around 5 days for us.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

+